4.6 Installation of Control Panel(Console,Box and Cabinet)
4.6.1 Quantity for acceptance inspection.
1 Control panel(console,box and cabinet)installed in rows shall be inspected 100%.
2 Control panel(console,box and cabinet)installed separately shall be inspected 30% randomly.
3 Other installation items shall be inspected 20% randomly.
4.6.2 Installation of control panel.
1 Manufacture and installation inspection and acceptance of control panel(console,box and cabinet)and equipment base are detailed in Table 4.6.2-1.
Table 4.6.2-1 Manufacture and installation of control panel(console,box and cabinet)and equipment base

Table 4.6.2-1(Continued)

2 Installation inspection and acceptance of control panel(console,box and cabinet)and in rows are detailed in Table 4.6.2-2.
Table 4.6.2-2 Installation of control panel(console,box and cabinet)in rows

3 Installation inspection and acceptance of individual panel(console,box and cabinet)are detailed in Table 4.6.2-3.
Table 4.6.2-3 Installation of individual panel(console,box and cabinet)

4 Installation inspection and acceptance of thermostat,protective box and connection box are detailed in Table 4.6.2-4.
Table 4.6.2-4 Installation of thermostat,protective box and connection box

Table 4.6.2-4(Continued)

4.6.3 Installation of instruments on panel.
1 Installation inspection and acceptance of instrument on panel are detailed in Table 4.6.3-1.
Table 4.6.3-1 Installation of instruments on panel

2 Installation inspection and acceptance of distributed control system are detailed in Table 4.6.3-2.
Table 4.6.3-2 installation of distributed control system

3 Installation inspection and acceptance of digital display instrument are detailed in Table 4.6.3-3.
Table 4.6.3-3 Installation of digital display instrument

4 Installation inspection and acceptance of recording instrument are detailed in Table 4.6.3-4.
Table 4.6.3-4 Installation of recording instrument

5 Inspection and acceptance of survey instrument are detailed in Table 4.6.3-5.
Table 4.6.3-5 Survey instrument

6 Installation inspection and acceptance of flashing-signal alarm devices and large screen display are detailed in Table 4.6.3-6.
Table 4.6.3-6 Installation of flashing-signal alarm devices and large screen display

7 Installation inspection and acceptance of the control system for PLC are detailed in Table 4.6.3-7.
Table 4.6.3-7 Installation of the control system for PLC